Installation Operation Service Manual
2015-8-31 · Leave the plastic shroud on the boiler until all piping work is complete, cutting holes in the plastic for access to connections. Remove the bolts attaching the boiler to the crate at the underside of the bottom crating. Lift or slide the boiler off of the bottom crating into position.
Get Price